Changed:
< Partly as an exercise in running it, and partly to fit the 7x24 requirement, above, the system may be designed as an HA system, to allow the following to allow for very quick recovery from:
to
> Partly as an exercise in running it, and partly to fit the 7x24 requirement, above, the system may be designed as an HA system, to allow very quick recovery from:
The system:
(Can you tell I am a consultant Haha!!)
(Can you tell I was on RFC editing teams ahahah)
This is by far the easiest, but from a challenge/bragging rights point of view, it does not do a lot except reduce dependency on electrical requirements.
Forecast Cost: $1000
As far as "greener" ways.. this is by far cheaper and easier than a full off-grid solution.
Forecast Cost: $2500
Off-grid creates some very difficult decisions, but also provides allot of opportunity and interest. From a research point of view, compelling, but difficult and expensive.
Forecast Cost: $5000
It may be interesting to develop a cost-benefit scorecard that includes the factors used to make a decision. These factors include but are not limited to:
Green-PC | Grid-Tied | Off-Grid | |
Convenience | |||
Weighted Cost | |||
Grid Power Used | |||
Grid Power Weighted Value | |||
Totals |
Partly as an exercise in running it, and partly to fit the 7x24 requirement, above, the system may be designed as an HA system, to allow very quick recovery from:
The HA design could consist of the following components: