This is by far the easiest, but from a challenge/bragging rights point of view, it does not do a lot except reduce dependency on electrical requirements.
Forecast Cost: $1000
As far as "greener" ways.. this is by far cheaper and easier than a full off-grid solution.
Forecast Cost: $2500
Off-grid creates some very difficult decisions, but also provides allot of opportunity and interest. From a research point of view, compelling, but difficult and expensive.
Forecast Cost: $5000
It may be interesting to develop a cost-benefit scorecard that includes the factors used to make a decision. These factors include but are not limited to:
Green-PC | Grid-Tied | Off-Grid | |
Convenience | |||
Weighted Cost | |||
Grid Power Used | |||
Grid Power Weighted Value | |||
Totals |
Partly as an exercise in running it, and partly to fit the 7x24 requirement, above, the system may be designed as an HA system, to allow very quick recovery from: