Option 1 Discussion "Green-PC"

This is by far the easiest, but from a challenge/bragging rights point of view, it does not do a lot except reduce dependency on electrical requirements.

Forecast Cost: $1000

Option 2 Discussion "Grid-Tied"

As far as "greener" ways.. this is by far cheaper and easier than a full off-grid solution.

Forecast Cost: $2500

Option 3 Discussion "Off Grid"

Off-grid creates some very difficult decisions, but also provides allot of opportunity and interest. From a research point of view, compelling, but difficult and expensive.

Forecast Cost: $5000

Evaluation Criteria

It may be interesting to develop a cost-benefit scorecard that includes the factors used to make a decision. These factors include but are not limited to:

Green-PC Grid-Tied Off-Grid
Convenience
Weighted Cost
Grid Power Used
Grid Power Weighted Value
Totals

High Availability

Partly as an exercise in running it, and partly to fit the 7x24 requirement, above, the system may be designed as an HA system, to allow very quick recovery from:

The HA design could consist of the following components: